Comprising of both internal and external elements, this project was carried out across a number of different stages.

External works consisted of roof alterations, an overhaul of all existing sash windows, brickwork repairs and new paintwork. Internally, all levels from the ground floor to lever 4 were refurbished. This included new mechanical, electrical and data work, the replacing of internal fire doors, a total redesign of the existing toilets and all new carpet throughout. 

The reception area was also given a revamp with a new tiled floor and bespoke joinery. 

The most challenging aspect of all for this project was the installation of new chillers and air handling units which involved utilising a crane to lower them down an existing fireman’s chute.

  • Project

    29-31 Hill Street, London

  • Value

    £1.8 million

  • Duration

    32 Weeks

  • Project Manager

    MHBC

  • Architect

    MHBC

  • QS

    MHBC

  • Services Consultant

    MHBC

Divisional Director

Duncan Redman

Related Projects

Duncan Redman

Divisional Director

Duncan joined Collins in 2001 and has been a part of, and contributed to, the growth, development and success of the company. Having worked in the industry for over 30 years, Duncan has a wealth of experience and knowledge across a range of project types, from Cat B fit out to cut and carve refurbishment.

Duncan leads a committed, hardworking team who go the extra mile at every level to deliver a successful project. He believes in a hands on approach and management style, and leads his teams by example. He builds strong, honest relationships with clients which as a result, has consistently led to repeat business.

LinkedIn

Recent Projects

This website uses cookies to ensure the best possible experience for the user. Please accept or decline. See our cookie policy for more information