Project

26 Red Lion Square, London

Value

Undisclosed

Duration

14 weeks

Project Manager

Bollingbrook

Architect

BDG

QS

Bollingbrook

Services Consultant

GDM

This project took place over the course of 14 weeks. Works commenced with a complete strip out of the previous tenants fit out  followed by a CAT B fit out to the 3rd floor. This consisted of the installation a new suspended ceiling,  glass partition walls, feature joinery, alterations to the existing base build services and the installation  of  feature lighting  and AV. 

Open plan breakout areas and a new kitchen were also formed along with a comms room with fibre link to the 2nd floor.

Working alongside Bollingbrook, BDG and GDM, the project was successfully handed over January  2016.