Project

111 Buckingham Palace Road

Value

£8.5 million

Duration

52 weeks

Project Manager

Burnley Wilson Fish

Architect

Eric Parry Architects

QS

Burnley Wilson Fish

Services Consultant

Blyth & Blyth

A refurbishment involving heavy demolition works to an existing reception area within an occupied building with a Grade I listed façade. Works involved the addition of a steel frame on which a new zinc roof was installed. Internally, the walls and floors received a stone finish with new windows installed into the arches within the existing façade.

The mechanical and electrical services were completely stripped back and replaced. Careful consideration had to be given to maintaining the public walkway alongside Victoria Station. Works were completed January 2017.