• Project

    17 Devonshire Square

  • Value

    £6.3 million

  • Duration

    54 weeks

  • Project Manager

    Trident

  • Architect

    Tate Hindle

  • QS

    Trident

  • Services Consultant

    Cundall

A full Cat A refurbishment of 22,330 ft² across 7 floors, including self-contained retail units at basement, lower ground floor and ground floor levels.

Works involved internal reconfiguration including structural alterations and the construction of a new staircase, lift and toilet core.

A new brick façade was also constructed as well as a roof plant with louvred screens. The existing mechanical and electrical services were also given a full upgrade.