A £9.8 million Cat A and Cat B refurbishment delivering a standout reception and premium workspace.
Located in the heart of London Bridge, we have transformed Shackleton House into a modern, high-quality office environment across three upper floors and a reimagined ground-floor reception. Working within a Grade II listed building, we enhanced the character of the asset through carefully restored original brickwork, renewed glazing, and contemporary finishes, while delivering technical upgrades and improved thermal performance. The result is a refined, flexible workspace that blends heritage texture with crisp, modern design, complete with outstanding views of Tower Bridge.
The transformation includes refreshed workspace across the 3rd, 4th and 5th floors, complemented by a full Cat B refurbishment and an extended ground-floor reception. A new glazed façade fills the entrance with natural light and creates a striking new street presence within Hayes Galleria. Inside, exposed brickwork has been restored through extensive sandblasting and sealing, while refurbished windows with new plaster reveals enhance both performance and aesthetic.
The result is a vibrant, future-ready workspace that highlights the building’s heritage while delivering the functionality and refinement expected by modern tenants in this prime London Bridge location.
-
Project
Shackleton House
-
Value
£9.8m
-
Project Manager
Storey Project Ltd
-
Architect
Hale Brown Architects
-
QS
Gleeds
-
Services Consultant
Atelier Ten
-
Structural Engineers
Davies Maguire











