• Project

    26 Red Lion Square, London

  • Value

    Undisclosed

  • Duration

    14 weeks

  • Project Manager

    Bollingbrook

  • Architect

    BDG

  • QS

    Bollingbrook

  • Services Consultant

    GDM

This project took place over the course of 14 weeks. Works commenced with a complete strip out of the previous tenants fit out  followed by a Cat B fit out to the 3rd floor. This consisted of the installation a new suspended ceiling,  glass partition walls, feature joinery, alterations to the existing base build services and the installation of feature lighting and AV. 

Open plan breakout areas and a new kitchen were also formed along with a comms room with fibre link to the 2nd floor.

Working alongside Bollingbrook, BDG and GDM, the project was successfully handed over January  2016.