-
Carried out on behalf of ZBI Europe, Collins were appointed to return this 2 story office in the heart of London’s West End back to CAT A space. Following a major strip out including the removal of a staircase link between levels 2 and 3, new SAS met…
-
The creation of a 4D cinema within the existing confines of the Grade I Listed County Hall Building. The scope of works include new structural steel tiering, the installation of acoustic walling, vibrating floors and fully automatic acoustic doors in…
-
A traditionally procured project involving the complete internal Cat B fit out of a Grade II listed chapel to form a modern workspace over three floors for a well know publishing company. The building was heavily modified in a previous phase with con…
-
The reconfiguration of the ground floor of Orion House was the first phase of a complete re-launch of the entire building. The area was to be remodelled to create a new reception area with frameless glass walling and revolving door, a new retail spac…